Water Resources Engineering

Deep Tube-well Boring of 120m or 394ft depth at TGL

Deep Tube-well Boring of 16/8inch Dia 120m or 394ft depth with necessary materials supply, installation and commissioning job at Trillion Gold Ltd. (TGL) Fotehjongpur, Chirirbandor, Dinajpur.

Project Overview

STech Engineering successfully executed the end-to-end development of a high-capacity deep tube-well system for Trillion Gold Ltd. This project encompassed everything from initial geological boring to the procurement of premium materials, professional installation, and final technical commissioning. Technical Specifications & Highlights We utilized industrial-grade materials and precision engineering to ensure long-term durability and high flow rates:

• Total Depth: 120 Meters (394 Feet) of precision boring.

• Casing & Piping: * 16" & 8" High-grade uPVC Pressure Pipes. o Premium Filter Pipes for sediment-free water extraction.

• Pressure Rating: All fittings and fabrications meet PN 15 Class E standards.

• Scope of Work: Full turnkey solution—Supply, Installation, and Commissioning.

Promise: There is no compromise in our work.

Our service are 100% guaranteed.

Sinking/ Boring details:

(Sink dia= 16inch, depth= 160ft; Sink dia= 08inch, depth= 180ft and Strainer (8inch) = 60ft)

Project Information

  • Category Water Resources Engineering
  • Client Trillion Gold Ltd. (TGL)
  • Project Date 21 Jun, 2026

Project Reviews

0.0 0 reviews
No published reviews yet. Be the first one to share feedback about this project.

Write a Review