Civil Engineering

Deep Tube-well Boring of 100m or 328ft depth at MGL

Deep Tube-well Boring of 100m or 328ft depth with necessary materials supply, installation and commissioning job at Million Gold Ltd. (NPT-7)- Evergreen Product Factory (EPF), Uttara-EPZ, Nilphamari.

Project Overview

STech Engineering successfully executed the end-to-end development of a high-capacity deep tube-well system for Million Gold Ltd. This project encompassed everything from initial geological boring to the procurement of premium materials, professional installation, and final technical commissioning. Technical Specifications & Highlights We utilized industrial-grade materials and precision engineering to ensure long-term durability and high flow rates: • Total Depth: 100 Meters (328 Feet) of precision boring. • Casing & Piping: * 16" & 8" High-grade uPVC Pressure Pipes. o Premium Filter Pipes for sediment-free water extraction. • Pressure Rating: All fittings and fabrications meet PN 15 Class E standards. • Scope of Work: Full turnkey solution—Supply, Installation, and Commissioning.

Promise: There is no compromise in our work.

Our service are 100% guaranteed.

Sinking/ Boring details:

(Sink dia= 16inch, depth= 150ft; Sink dia= 08inch, depth= 120ft and Strainer (8inch) = 60ft)


Project Information

  • Category Civil Engineering
  • Client Million Gold Ltd. (MGL)
  • Project Date 06 May, 2026

Project Reviews

0.0 0 reviews
No published reviews yet. Be the first one to share feedback about this project.

Write a Review