Project Overview
STech Engineering successfully executed a specialized Deep Tube-well Boring job for Billion Gold Limited in Rangpur. The service involved sinking a bore to a depth of 330 feet with a 4-inch diameter, utilizing PVC materials for the casing as specified by the bore log.
• Service Provided: Our team performed the core sinking and boring services, and supplied necessary consumables like Pea Stone.
• Client Collaboration: The client, Billion Gold Limited, provided the primary structural materials, including the Pipe, Filter, and Water Pump with associated parts.
Billion Gold Limited is a sister concern of the Evergreen Product Factory (EPF), demonstrating our proven capability to support the essential water infrastructure needs of major industrial enterprises.
Project Information
- Category Completed
- Client Evergreen Products Group Limited
- Project Date 07 May, 2023