Deep Tube-well Boring (120m) & Commissioning
Deep Tube-well Drilling & Sinking Service
Project Overview
Project Description STech Engineering successfully executed the end-to-end development of a high-capacity deep tube-well system for Trillion Gold Ltd. This project encompassed everything from initial geological boring to the procurement of premium materials, professional installation, and final technical commissioning. Technical Specifications & Highlights We utilized industrial-grade materials and precision engineering to ensure long-term durability and high flow rates: • Total Depth: 120 Meters (394 Feet) of precision boring. • Casing & Piping: * 16" & 8" High-grade uPVC Pressure Pipes. o Premium Filter Pipes for sediment-free water extraction. • Pressure Rating: All fittings and fabrications meet PN 15 Class E standards. • Scope of Work: Full turnkey solution—Supply, Installation, and Commissioning.
Promise: There is no compromise in our work.
Our service are 100% guaranteed.
Project Information
- Category Civil Engineering
- Client Trillion Gold Ltd. (TGL)
- Project Date N/A
Project Reviews
Write a Review
Login required for submitting a review.
Everyone can read published reviews, but only logged-in users can rate and write feedback.
Login to Review