Civil Engineering

Deep Tube-well Boring (120m) & Commissioning

Deep Tube-well Drilling & Sinking Service

Project Overview

Project Description STech Engineering successfully executed the end-to-end development of a high-capacity deep tube-well system for Trillion Gold Ltd. This project encompassed everything from initial geological boring to the procurement of premium materials, professional installation, and final technical commissioning. Technical Specifications & Highlights We utilized industrial-grade materials and precision engineering to ensure long-term durability and high flow rates: • Total Depth: 120 Meters (394 Feet) of precision boring. • Casing & Piping: * 16" & 8" High-grade uPVC Pressure Pipes. o Premium Filter Pipes for sediment-free water extraction. • Pressure Rating: All fittings and fabrications meet PN 15 Class E standards. • Scope of Work: Full turnkey solution—Supply, Installation, and Commissioning.

Promise: There is no compromise in our work.

Our service are 100% guaranteed.

Project Information

  • Category Civil Engineering
  • Client Trillion Gold Ltd. (TGL)
  • Project Date N/A

Project Reviews

0.0 0 reviews
No published reviews yet. Be the first one to share feedback about this project.

Write a Review