Civil Engineering

Deep Tube-well Boring (100m / 333 ft)

Deep Tube-well Drilling & Sinking Service

Project Overview

STech Engineering successfully executed a complete Deep Tube-well Boring project for Trillion Gold Ltd. (TGL) at their Dinajpur site, achieving a total depth of approximately 333 ft (100m). • Service Provided: We delivered specialized sinking services based on the project's design drawings, including: o 150 ft of 16-inch diameter sinking. o 100 ft of 8-inch diameter sinking. o Installation of 80 ft of 8-inch strainer/filter. • Material Management: We provided all required consumables, including Centralizers, End Caps, Bleaching Powder, Boring Chemicals, Welding Electrodes, and managed the Machineries Transportation. The client (TGL) supplied the main structural components (16" & 8" Pipes, Strainer, Reducer, Sand, Stone, and Pump). TGL is a sister concern of the Evergreen Product Factory (EPF), highlighting our capability to support large-scale infrastructure projects for major industrial groups. Promise: There is no compromise in our work. Our service are 100% guaranteed.

Project Information

  • Category Civil Engineering
  • Client Trillion Gold Ltd. (TGL)
  • Project Date 22 Aug, 2022

Project Reviews

0.0 0 reviews
No published reviews yet. Be the first one to share feedback about this project.

Write a Review